SAS - Halabyan 22
Client: SAS GRPUP

Overview
This project included full electrical installation works for a supermarket and food court, covering power supply, surveillance systems, fire alarm systems, and speaker wiring. The goal was to ensure reliable and safe operation of all electrical and monitoring systems.
Challenge
The main challenge was integrating multiple complex systems—power, surveillance, fire alarms, and audio—within the same commercial space without disrupting ongoing operations. Ensuring compatibility, safety, and efficiency across all systems required careful coordination.
Solution
A detailed assessment and planning phase was conducted to coordinate all installations. Electrical systems, surveillance cameras, fire alarms, and speaker cabling were installed and configured in stages to ensure seamless integration. All components were thoroughly tested for safety and performance.
Result
The project was successfully completed, delivering a fully operational, safe, and reliable infrastructure for both the supermarket and food court. All electrical, monitoring, and audio systems function efficiently, providing long-term stability and operational reliability.