Yerevan Brandy Company, Berd Branch
Client: Yerevan Brandy Company
Overview
The project involved comprehensive works at a transformer substation, including renovation of the high-voltage section, installation and commissioning of 10kV distribution equipment, installation and setup of a 400kVA dry-type transformer, and installation and commissioning of 0.4kV equipment. The goal was to enhance reliability, efficiency, and safety of the electrical network.
Challenge
The main challenge was executing complex high- and low-voltage works while ensuring safety, minimizing operational disruptions, and coordinating multiple stages of installation for both large transformers and distribution equipment.
Solution
A structured, phased approach was applied, starting with careful assessment and planning. High-voltage systems were renovated and tested, transformers and distribution equipment were installed with precision, and all components were commissioned according to safety and operational standards. Coordination between teams ensured smooth workflow and minimal downtime.
Result
The project was successfully completed, delivering a fully operational and reliable transformer substation. All high- and low-voltage systems function efficiently, providing long-term safety, stability, and uninterrupted power supply.